DIESE DOI-METADATEN WURDEN ZULETZT AKTUALISIERT AM: 2026-11-10 15:54
Vollständiger Titel
PROJECT MANAGER (IL)
Verlag
FrancoAngeli
ISSN
2037-7363 (Gedruckte Zeitschrift)
2037-7657 (Online-Zeitschrift)
Nummer der Ausgabe
68
Andere Beschreibung der Ausgabe
68
Erscheinungsdatum der Ausgabe
2026
Vollständiger Titel
Quando i numeri non bastano: ripensare la misurazione del successo nei progetti "human-centred
Von (Autor)
Erste Seite
31
Letzte Seite
36
Sprache des Textes
Italienisch
Erscheinungsdatum
2026/10
Copyright
2026 FrancoAngeli srl
Unstructured Zitierung
[1] Atkinson R. (1999). “Project mana-gement: Cost, time and quality, two best guesses and a phenomenon, its time to accept
other success cri-teria”, International Journal of Project Management, 17(6), 337-342
https://doi.org/10.1016/S0263-7863(98)00069-6
Unstructured Zitierung
[2] Donabedian A. (1988). “The quality of care: How can it be assessed?”, JAMA, 260(12), 1743-1748
https://doi.org/10.1001/jama.1988.03410120089033
Unstructured Zitierung
[3] Ebrahim A. & Rangan V.K. (2014). “What impact? A framework for me-asuring the scale and scope of so-cial performance”,
California Mana-gement Review, 56(3), 118-141
https://doi.org/10.1525/cmr.2014.56.3.118
Unstructured Zitierung
[4] Grieco C., Michelini L. & Iasevoli G. (2015). “Measuring value creation in social enterprises: A cluster analysis of social
impact assessment mo-dels”, Nonprofit and Voluntary Sector Quarterly, 44(6), 1173-1193
https://doi.org/10.1177/0899764014555986
Unstructured Zitierung
[5] Ika L.A. (2009). “Project success as a topic in project management journals”, Project Management Journal, 40(4), 6-19
https://doi.org/10.1002/pmj.20137
Unstructured Zitierung
[6] Iezzoni L.I., Marsella S.A., Lopinsky T., Heaphy D. & Warsett K.S. (2017). “Do prominent quality measure-ment surveys
capture the concerns of persons with disability?”, Disabili-ty and Health Journal, 10(2), 222-230
https://doi.org/10.1016/j.dhjo.2017.01.007
Unstructured Zitierung
[7] Jugdev K. & Müller R. (2005). “A re-trospective look at our evolving understanding of project success”, Project Management
Journal, 36(4), 19-31
https://doi.org/10.1177/875697280503600403
Unstructured Zitierung
[8] Santana M.J., Ahmed S., Lorenzet-ti D., Jolley R.J., Manalili K., Zelinsky S., Quan H. & Lu M. (2019). “Measu-ring patient-centred
system perfor-mance: A scoping review of patient-centred care quality indicators”, BMJ Open, 9(1), e023596
https://doi.org/10.1136/bmjopen-2018-023596
Unstructured Zitierung
[9] Santana M.J., Manalili K., Zelinsky S., Brien S., Gibbons E., King J., Frank L., Wallström S., Fairie P., Leeb K., QuanH.
& Sawatzky R. (2020). “Improving the quality of person-centred he-althcare from the patient perspecti-ve: Development of person-centred
quality indicators”, BMJ Open, 10(10), e037323
https://doi.org/10.1136/bmjopen-2020-037323
Unstructured Zitierung
[10] Santos C., Santos V., Tavares A. & Va-rajão J. (2020). “Project manage-ment in public health: A systematic literature
review on success criteria and factors”, Portuguese Journal of Public Health, 38(1), 37-48
https://doi.org/10.1159/000509531
Unstructured Zitierung
[11] Serrador P. & Turner R. (2015). “The relationship between project suc-cess and project efficiency”. Project Management
Journal, 46(1), 30-39
https://doi.org/10.1002/pmj.21468
Unstructured Zitierung
[12] Shenhar A.J., Levy O. & Dvir D. (1997). “Mapping the dimensions of project success”, Project Manage-ment Journal, 28(2), 5-13